Jinhua No.4 High School New Project Report Hall
Release Time:
2025-08-11
Jinhua No.4 Middle School New Project Report Hall
The Jinhua No.4 Middle School Education Group High-speed Rail New City Campus project is invested and constructed by Jinhua No.4 Middle School. Located in Wucheng District's High-speed Rail New City, the project covers a total construction area of 56199.57m². From the initial design stage, the goal of energy conservation, green development, and low carbon emissions was established. The entire project is designed to meet the standards of a two-star green building, utilizing prefabricated building construction technology. It is listed as a demonstration project for carbon peak and carbon neutrality in the construction field of Jinhua City in 2022.

The project's report hall is designed as an ultra-low energy consumption building, with a construction area of 1484.55m². Green and low-carbon goals are achieved through active and passive technologies. Active technologies include energy-efficient lighting, all-heat recovery ventilation units, recyclable materials, and all-electric kitchens. Passive technologies mainly focus on improving the thermal insulation performance of the enclosure structure, strengthening thermal bridge treatment, and air tightness. A solar photovoltaic system is installed on the roof, with a total of 100㎡ of solar photovoltaic panels. Through the adoption of passive design and active energy measures, the project's building's comprehensive energy saving rate reaches 59.07%, and the renewable energy utilization rate reaches 44.81%.

In June 2024, it obtained the ultra-low energy consumption building identification, becoming the first ultra-low energy consumption building in Wucheng District.
Relevant attachments
COPYRIGHT © 2023 Nanjing Green Building Optoelectronics Co., Ltd. SEO