Suzhou Boshide Building No. 1

Release Time:

2025-07-30


Suzhou Boshide Building No. 1

Installation time: 2014, installed capacity: 338KW. This building mainly adopts passive energy saving and supplementary active energy saving, adhering to the design concept of low carbon and environmental protection. It uses a series of green technologies such as rainwater harvesting, natural lighting, and photovoltaic power generation. It is an energy-efficient, comfortable, and efficient demonstration project. Among them, the photovoltaic power generation part uses high-efficiency double-glass components, with an annual power generation of 420,000 kWh, providing 23% of the building's electricity consumption.

This building has obtained the highest level of green building certification from both China and the United States: LEED-NC Platinum certification from the United States and the China Green Building Three-Star Design Mark.


Relevant attachments


Help the construction of green energy buildings and strive to become the leader in the BIPV industry.

Contact Us

Contact Us

Contact: Mr. Li

Tel: 13564139588

Email: yaocheng.li@jz.solargiga.com

Address: Building 1, Yintan Cultural and Creative Park, No. 88, Yapeng Road, Jianye District, Nanjing City, Jiangsu Province

COPYRIGHT © 2023 Nanjing Green Building Optoelectronics Co., Ltd. SEO

Business License