Special Plan for Green Building in Pan'an County, Zhejiang Province (2023-2030)

Release Time:

2024-05-07


1. planning scope and years

 

Planning scope: it is divided into three levels: special important development area, important development area and general development area. The special important development areas are Anwen Street, Xinwo Street and Jianshan Town; the important development areas are Lengshui Town, Dapan Town, Panfeng Township, Yushan Town and Shanghu Town; the general development areas are Inchuan Town, Shuangfeng Township, Shuangxi Township, Yaochuan Township, Fangqian Town and Jiuhe Township.

Planning period: recent 2023-2025, long-term 2026-2030.

 

2. planning objectives

 

1The overall development goal of green building.

 

Target 2023-2025: Within the scope of county-level urban construction land in Pan 'an County, 100 per cent of new civil buildings (excluding rural self-built houses) will be constructed in accordance with the mandatory standards for green buildings above one star. On this basis, it is mandatory for state organs to build office buildings and other public buildings invested by the government or mainly by the government to follow the mandatory standards for green buildings of two stars or above; the proportion of new civil construction area constructed according to the mandatory standards for green buildings above two-star level reached more than 36%, and the proportion of new civil construction area constructed according to the mandatory standards for three-star green buildings reached more than 3%.

 

Target 2026-2030: On the basis of the recent targets, the requirements for green buildings will be further improved. Among them, the proportion of newly-built civil buildings constructed according to the mandatory standards for green buildings above two stars will reach more than 42%, and the proportion of newly-built civil buildings constructed according to the mandatory standards for green buildings above three stars will reach more than 5%.

 

2The overall development goal of construction industrialization.

 

Improve the coverage of assembly buildings. Government-invested or government-invested projects (with a construction area of more than 10,000 square meters) are fully constructed with prefabricated technology, and all affordable housing projects are constructed with prefabricated construction.

 

Target 2023-2025: New projects on newly sold or allocated land in Pan 'an County will fully promote prefabricated buildings, with prefabricated buildings accounting for 30% of the newly-built civil construction area and steel structure prefabricated buildings accounting for 12% of the newly-built civil construction area. New public buildings such as schools, hospitals, gymnasiums, shopping malls and office buildings will be encouraged to give priority to steel structure buildings, among them, government investment or government investment-based new public buildings should give priority to steel structure buildings.

 

Target 2026-2030: New projects on newly transferred or allocated land in Pan'an County will fully promote assembly buildings, with assembly buildings accounting for 35% of the new civil construction area and steel structure assembly buildings accounting for 14% of the new civil construction area.

 

3Overall Development Goals for Renewable Energy Building Applications

 

Target 2023-2025: The replacement rate of renewable energy applications for new civil buildings in Pan'an County will reach 8%, and the installed capacity of solar photovoltaic systems will reach 5000 kW. The new solar photovoltaic building integrated installed capacity of existing civil buildings reached 17.0kWp.

 

By 2025, new buildings in public institutions can be installed photovoltaic roof photovoltaic coverage rate of 50%, while achieving a cumulative renewable energy application area of 1 million square meters.

 

Target 2026-2030: The replacement rate of renewable energy applications for new civil buildings in Pan 'an County will reach 10%, and the installed capacity of solar photovoltaic systems will reach 8000 kW. The new solar photovoltaic building integrated installed capacity of existing civil buildings reached 22.0kWp.

 

4. Building carbon emission development goals overall development goals

 

Target 2023-2025: The reduction value of average building operation carbon emission intensity in Pan 'an County shall not be less than 7.0kgCO2/(m2• a). Ultra-low energy consumption building area reaches 8000 m2.

 

Target 2026-2030: The reduction value of average building operation carbon emission intensity in Pan 'an County shall not be less than 8.0kgCO2/(m2• a). Ultra-low energy consumption building area reaches 10000 m2.

 

5The overall goal of green transformation of existing buildings.

 

Target 2023-2025: Complete energy-saving renovation of existing public buildings with an area of 35000 m2, which involves government investment or projects dominated by government investment to be completed, 100 of the renovation area meets the requirements of the current "Evaluation Standard for Green Renovation of Existing Buildings" (GB/T 51141) one-star standard for green buildings; The energy-saving renovation area of existing residential buildings is 5000 m.2. Complete the statistics of existing civil buildings in Pan'an County, and implement dynamic monitoring of energy consumption for the renovation of existing office buildings of government and state agencies in the county and other existing public buildings with a total construction area of more than 10,000 square meters.

 

Target 2026-2030: Complete energy-saving renovation of existing public buildings with an area of 45000 m2, which involves government investment or projects dominated by government investment to be completed, 100 of the renovation area meets the requirements of the current "Evaluation Standard for Green Renovation of Existing Buildings" (GB/T 51141) one-star standard for green buildings; The energy-saving renovation area of existing residential buildings is 6000 m.2. According to the data of energy consumption monitoring platform and energy consumption quota of Jinhua City, the energy consumption audit mechanism is established.

 

3. planning zoning and control requirements

 

1. Target management partition and requirements.

 

Pan'an County covers a total area of 1194.83 square kilometers, including 2 streets (Anwen Street, Xinwo Street), 7 towns (Lengshui Town, Inchuan Town, Dapan Town, Fangqian Town, Jianshan Town, Yushan Town, Shanghu Town), 5 townships (Shuangfeng Township, Panfeng Township, Shuangxi Township, Yaochuan Township, Jiuhe Township).

 

According to the requirements of "Zhejiang Province Green Building Special Planning Guidelines (2022 Edition)" and "Jinhua City Green Building Special Planning (2022-2030)", combined with the overall planning and administrative divisions of Pan'an County, it is divided into three major areas, namely: Southwest Town Area, Southeast Town Area and Northeast Town Area.

 

2Policy unit division and requirements.

 

Consider the streets, towns, economic development, urbanization development degree, according to the actual situation of different regions to determine the relevant indicators of green building requirements, to facilitate the implementation of each region.


Relevant attachments


Help the construction of green energy buildings and strive to become the leader in the BIPV industry.

Contact Us

Contact Us

Contact: Mr. Li

Tel: 13564139588

Email: yaocheng.li@jz.solargiga.com

Address: Building 1, Yintan Cultural and Creative Park, No. 88, Yapeng Road, Jianye District, Nanjing City, Jiangsu Province

COPYRIGHT © 2023 Nanjing Green Building Optoelectronics Co., Ltd. SEO

Business License