Latest Photovoltaic Policy in 2024: Development Plan
Release Time:
2024-05-06
China's photovoltaic industry has been in the forefront of the world in terms of manufacturing scale, and will continue to expand the scale of the industry in the future to meet the needs of domestic and foreign markets. The government introduced some photovoltaic policies in 2024. The introduction of these policies and plans will increase support for the photovoltaic industry, encourage enterprises to expand production scale and increase industrial concentration. So what are the development plans in 2024? Sobi Photovoltaic Network summarizes these development plans for you, hoping to help you.
| Serial Number | Region | Department | Policy Documents | Key Points |
| 1 | Guangdong Province | Guangdong Provincial Development and Reform Commission and other six departments | Notice on Issuing the Action Plan for Cultivating New Energy Strategic Emerging Industrial Clusters in Guangdong Province (2023-2025) | Vigorously develop offshore wind power,Solar Energy, advanced nuclear energy and other advantageous industries, accelerate the cultivation of new energy storage, hydrogen energy, smart grid and other emerging industries, build coastal new energy industry belts and industrial clusters with different layouts in the province, and promote the transformation of clean and low-carbon energy by 2025, Form a leading domestic and world-class new energy industry cluster |
| 2 | Guangdong Province | Department of Industry and Information Technology of Guangdong Province | "The province's industrial and information development in 2023 and the main work plan for 2024" | Give full play to the advantages of photovoltaic, offshore wind power and other resource allocation in eastern and western Guangdong, strengthen the docking with solar photovoltaic head enterprises, seize the core needs of enterprises to formulate more powerful introduction measures, and accelerate the construction of a number of projects. |
| 3 | Inner Mongolia Autonomous Region | Inner Mongolia Autonomous Region People's Government | Notice on Issuing the Pilot Work Plan for the Transition from Dual Control of Energy Consumption to Dual Control of Carbon Emissions in Autonomous Regions and Key Points of Work in 2024 | Optimize and improve the new energy market-based consumption policy, comprehensively consider the characteristics of the project, flexibly implement the new energy market-based consumption project, and reasonably increase the allocation scale of new energy power generation: promote the replacement of green electricity by stock load, support the use of green electricity by stock load through market-based consumption: strengthen the system standby support of power grid enterprises for the new energy market-based consumption project, and reasonably ensure the normal operation of power load |
| 4 | Inner Mongolia Autonomous Region | Inner Mongolia Autonomous Region People's Government | Implementation Opinions on Promoting the High-quality Development of National Economic and Technological Development Zones | Give priority to the arrangement of wind power and photovoltaic construction indicators, and support the implementation of the new energy source, network, load and storage integration supporting construction in Hohhot Economic Development Zone: adopt dynamic management of indicators separately in the allocation of carbon emission indicators and other indicators: give appropriate preference to the binding indicators such as land use, energy use and water use to meet the development needs of national economic development zones. |
| 5 | Inner Mongolia Autonomous Region | Inner Mongolia Autonomous Region People's Government | Notice on Issuing the List of Policies on Adhering to Steady Progress in 2024 to Promote Steady Development of Industries | Under the premise of conforming to the land space planning, wind power photovoltaic projects are supported to use unused land. For those who use unused land such as Gobi and desert, do not occupy the land and do not change the surface form, the permanent construction land of the project shall be determined according to the in-situ category. The approval procedures encourage wind power photovoltaic projects to use open-pit mine dump, coal mining subsidence area land for agricultural land that cannot be restored due to coal mining subsidence, according to the technical regulations and standards for change investigation, those that meet the conditions for change shall be investigated according to the current situation and reported to the state for change. |
| 6 | Yunnan Province | Yunnan Energy Bureau | "Reply to the opinions and suggestions put forward by Shen Xueling, deputy to the National People's Congress during the second session of the 14th Provincial People's Congress" | Strengthen the overall planning at the provincial level, sort out the list of new energy projects to be started and put into production one by one, coordinate and promote the implementation one by one, ensure the new energy projects to be started and put into production in 2024, continuously strengthen the coordination and joint optimization of water, fire, scenery, storage, multi-energy storage, multi-energy coordination and joint optimization, strengthen the mutual aid of large power grid platforms, continuously improve the consumption capacity and flexible adjustment capacity of the whole network, and promote the full consumption of renewable energy |
| 7 | Jilin Province | People's Government of Jilin Province | Notice on Printing and Distributing the Medium-and Long-Term Plan for the Trunk Highway Network of Jilin Province (2023-2035) | Plan and build a convenient, efficient and moderately advanced charging and replacement network, make overall plans for traditional energy and new energy facilities in highway service areas, and encourage the rational distribution of photovoltaic power generation and energy storage facilities along the highway. |
| 8 | Jilin Province | People's Government of Jilin Province | Notice on Measures to Accelerate the Development of New Energy Industry in Jilin Province | Multi-policy and implementation of the cultivation of high-quality development growth pole, multi-measures to accelerate the formation of new quality productivity, speed up the creation of green energy industrial park, improve the project construction policy support, increase the guarantee of project construction elements, strengthen the "green electricity ten consumption" project power grid support, speed up the "green electricity ten" emerging industry cultivation |
| 9 | Fujian Province | Fujian Provincial People's Government | Opinions on Supporting Ningde City to Develop Sandu'ao and Build the Core Area of New Energy and New Materials Industry | Accelerate the construction of clean energy application cluster area. Support Ningde City to continuously promote the development and utilization of clean energy such as nuclear water, scenery and hydrogen storage, build an important clean energy base along the southeast coast, support the construction of near-zero carbon projects, promote the exploration and construction of "near-zero factories", "near-zero carbon industries" and "near-zero carbon parks", build a pilot project of "zero-carbon factories" and "zero-carbon energy islands" in Ningde City in the era, support the development and construction of photovoltaic power station projects such as "offshore photovoltaic" and "complementary fishing and light". |
| 10 | Henan Province | Henan Provincial Department of Industry and Information Technology | Reply to Proposal No. 1310461 of the First Session of the 13th CPPCC Provincial Committee | The next work plan focuses on optimizing the industrial layout, supporting industrial collaborative innovation, and strengthening open cooperation. |
| 11 | Shandong Province | CPC Shandong Anshandong Provincial People's Government | Opinions on Accelerating the High-Quality Development of the Digital Economy | In-depth development of energy electronics "gathering energy" project, within the framework of national policies to support Dongying City, Linyi City to expand the scale of photovoltaic industry, support Zaosheng City, Jining City to develop energy storage lithium ion, sodium ion batteries, support conditional cities to expand the production of power semiconductor devices and automotive electronic modules, components |
| 12 | Shandong Province | People's Government of Shandong Province | Notice on Printing and Distributing the Action Plan for New Urbanization Construction in Shandong Province (2024-2025) | Accelerate the development of green and low-carbon energy transformation. By 2025, the installed capacity of new energy and renewable energy will reach 0.1 billion kilowatts. In addition, a number of key projects in the manufacturing sector worth more than 100 million yuan are sorted out every year, and a three-year action plan for technological transformation and upgrading of enterprises in the province is issued for eligible financial credit, and about 10000 technological transformation projects with an investment of more than 5 million yuan are implemented each year. |
| 13 | Sichuan Province | Sichuan Provincial Department of Economy and Information Technology and other six departments | Notice on Issuing the Implementation Opinions on Promoting the High-quality Development of the Photovoltaic Industry | By 2027, the development level of industrial clusters will be further improved, the industrial chain supply chain will be more healthy and stable, and the industrial innovation and development capabilities will continue to increase. We will build an industrial cluster with the coordinated development of the whole industrial chain of "silicon-silicon chip-cell chip-module-photovoltaic power generation system and application". The production capacity of silicon materials will maintain the leading position in the country. The key common technologies of high-efficiency cells will be at the leading level in the country. The production capacity of modules will steadily increase. The output value of the industry will exceed 500 billion yuan. We will build a photovoltaic industry base with important influence in the world. |
| 14 | Shandong Province | Shandong Development and Reform Commission | Announcement on Soliciting Opinions on Several Measures to Further Improve the Green Financial System and Promote Energy and Industrial Transformation | Green transformation of the energy system. Focus on supporting the development of new energy sources such as wind energy, solar energy, biomass energy, geothermal energy, hydrogen energy and nuclear energy: promote the transformation of traditional energy sources such as clean and efficient development, transformation and utilization of coal: support social capital to participate in the construction of new energy storage: establish and improve the market mechanism to adapt to the high proportion of new energy consumption |
| 15 | Guangxi Zhuang Autonomous Region | People's Government of Guangxi Zhuang Autonomous Region | Guiding Opinions on Supporting the High-Quality Construction of Guangxi Dongrong Pilot Demonstration Zone (Hezhou) | Accelerate the construction of wind, photovoltaic and biomass power generation projects, and improve the level of intelligent production and scheduling of renewable energy. By 2025, the total industrial output value of calcium carbonate and metal materials in Hezhou will reach 45 billion yuan, and strive to increase the installed capacity of wind power and photovoltaic power generation to 1 million kilowatts. |
| 16 | Guangdong Province | Shenzhen Bao'an District People's Government | Notice of Bao'an District on Measures to Promote High-quality Development of New Energy Industry | In order to build a "41" new energy industry system with photovoltaic, new energy storage, smart grid and integrated energy services as the core development areas and hydrogen energy as the forward-looking layout area, this measure focuses on supporting energy-saving and environmental protection silicon materials, next-generation crystalline silicon cells (Topcon, HJT, XBC), thin-film solar cells, advanced inverter technology and other fields in the photovoltaic industry. |
| 17 | Ningxia Hui Autonomous Region | Guyuan Municipal People's Government | Notice on Issuing the Implementation Plan for Expanding Domestic Demand in Guyuan City | Support enterprises to invest in waste recycling projects such as waste electrical appliances, photovoltaic modules, scrap cars, express packaging, etc., develop a circular economy, establish and improve green product standards, labeling, certification systems and ecological product value realization mechanisms, in addition, enhance energy supply security capabilities. Adhere to the integrated development of "source network, load and storage chain", speed up the layout of clean coal power, wind photovoltaic, new energy storage and other new energy industries, promote the expansion of coal mine production and energy, build a new power system, increase the installed capacity of clean energy by more than 4 million kilowatts, and make every effort to build a clean energy transformation base in southern Ningxia |
| 18 | Inner Mongolia Autonomous Region | Baotou Municipal Committee of the Communist Party of China Baotou Municipal People's Government | Implementation Opinions on Accelerating the Implementation of Innovation-driven Development Strategy and Promoting the Development of Strategic Emerging Industries | We will comprehensively upgrade the energy level of the "World Green Silicon City", speed up the construction of a complete industrial chain and industrial ecology, and create a higher energy level "World Green Silicon City". In 2024, the output value of the city's crystalline silicon photovoltaic industry will reach more than 200 billion yuan. |
| 19 | Jiangsu Province | Jiangsu Provincial People's Government of Jiangsu Province | Notice on Supporting the High-quality Development of New Energy Industry in Changzhou | By 2025, the output value of Changzhou's new energy sector will strive to exceed one trillion yuan, with leading traction, supporting support, government-enterprise linkage and production-city integration, forming a pattern of common development of new energy industry brands and city brands. By 2035, the output value will be further expanded on the basis of 2025. The four major links of power generation, energy storage, transmission and application will achieve deep-seated and high-concentration integrated development. New energy will be in production,! Live penetration rate is in the leading position in the country |
| 20 | Hunan Province | Hunan Provincial Department of Transportation | Notice on Issuing the Guiding Opinions on the Design and Construction of Expressway Service Areas in Hunan Province | Encourage the use of land resources along the highway, explore the application of green energy such as photovoltaic power generation on the highway, promote the complementary advantages of resources, and promote the sustainable development of greener, more integrated, smarter and higher-end integrated transportation |
| 21 | Chongqing Municipality | Chongqing Economic and Information Commission | Public solicitation of opinions on the "Chongqing Digital Energy Low-Carbon City Development Action Plan (2024-2026) (Draft)" | By 2026, the city's digital energy low-carbon city development has achieved remarkable results, and a number of landmark projects with demonstration and driving effect will be built. More than 1000 user-side demonstration projects in photovoltaic and energy storage, virtual power plants, green factories, green transportation, green buildings and other fields have been completed. Users will have an energy storage scale of 1 million kilowatts/2 million kilowatt-hours and a cumulative installed capacity of more than 900000 kilowatts by 2024, a cumulative installed capacity of more than 1.2 million kilowatts by 2025 and a cumulative installed capacity of more than 1.5 million kilowatts by 2026. |
| 22 | Zhejiang Province | Zhejiang Development and Reform Commission | Notice on Issuing the Policy of Expanding Effective Investment in Zhejiang Province in 2024 | We will support the high-quality development of renewable energy, add more than 8 million kilowatts of wind power, promote the "full operation" of wind power in provincial-administered sea areas through competitive allocation, intensify the pilot demonstration of far-reaching sea wind power, implement various "photovoltaic" actions, encourage all localities to combine with reality, make use of existing agricultural facilities greenhouses, and restore land, etc., and implement the "Common Rich Photovoltaic Agriculture Promotion Project" |
| 23 | Henan Province | Nanyang Municipal People's Government | Notice on Issuing the Implementation Plan of Nanyang City's Ambient Air Quality Compliance Action (2024-2025) | Accelerate the development of non-fossil energy, focus on photovoltaic power generation and wind power, and supplement biomass, pumped storage, geothermal energy, hydrogen energy, etc., and promote the diversification and coordinated development of renewable energy according to local conditions. Priority will be given to supporting the construction of projects such as "integration of source, network, load and storage", "high proportion of wind power energy storage", "high proportion of photovoltaic energy storage" and "integration of wind, wind power installed capacity of fire and storage" by 2025, the installed capacity of photovoltaic power generation has reached more than 4.3 million kilowatts, and the installed capacity of renewable energy power generation in the city has reached more than 8.5 million kilowatts. All new energy power generation is for self-use in the city and is not exported. |
| 24 | Anhui Province | Department of Ecological Environment of Anhui Province | Notice on Issuing the Implementation Plan for Further Optimizing Environmental Impact Assessment to Serve High-quality Economic Development in Anhui Province | Included in the pilot industrial park should fill in the environmental impact registration form of urban roads, urban (town) pipe network and pipe corridor construction, distributed photovoltaic power generation, primary medical and health services, urban drainage river sluices, drainage pumping stations and other five types of construction projects, exempt from EIA filing management |
| 25 | Ningxia Hui Autonomous Region | People's Government of Ningxia Hui Autonomous Region | Notice on Issuing the Action Plan for the Year of Project Investment in 2024 | In 2024, the investment in the power industry dominated by new energy in Ningxia Hui Autonomous Region will increase by more than 50%, and the proportion of industrial investment will increase to more than 50%. One of the key tasks in 2024 is to implement the security enhancement investment attack action. Among them, it is clear that the implementation of Yanchi hundreds of billions of large-scale gas fields and oil fields to develop 4 million kilowatts of photovoltaic, 1 million kilowatts of pumped storage series and other energy security projects, Shuangma No.2 Mine, Xinqiao Coal Mine, Weisan Coal Mine, Wangwa Mine and other resource security projects. |
| 26 | Guizhou Province | Wangmo County People's Government | Notice on Issuing the Comprehensive Work Plan for Energy Conservation and Emission Reduction in Wangmo County during the 14th Five-Year Plan | Strictly implement the technical standards related to building energy conservation and renewable energy utilization, promote the improvement of energy efficiency standards for new residential buildings and public buildings, accelerate the development of ultra-low-energy buildings and low-carbon buildings, improve the relevant standard system for energy-saving renovation of existing buildings, and actively promote existing Residential buildings, public buildings, accelerate the development of renewable energy building integration, explore the construction of "light storage, straight and soft" buildings to improve the application of renewable energy in buildings, promote technologies such as photovoltaic power generation, solar thermal, air source or water source heat pump according to local conditions |
| 27 | Guangdong Province | Guangdong Provincial Development and Reform Commission and other departments | Notice on Issuing the Action Plan of Guangdong Province for Cultivating and Developing Future Green and Low-carbon Industrial Clusters | Accelerate the new generation of high-efficiency photovoltaic technology innovation and equipment manufacturing innovation, promote the upgrading of photovoltaic industry, promote the research and development of building integrated photovoltaic (BIPV) modules, encourage the adoption of building integrated photovoltaic design, carry out the integration application of high-efficiency photovoltaic cells and building materials, promote the construction of high-efficiency photovoltaic research and development centers in Guangzhou, Shenzhen, Zhuhai, Foshan and other high-efficiency photovoltaic research and development centers, strengthen the dominant position of Guangzhou, Shenzhen, Dongguan and other places in the fields of photovoltaic inverter photovoltaic production equipment and photovoltaic slurry, encourage Zhongshan, Jiangmen and other places to cultivate and expand the photovoltaic industry, and promote leading enterprises to lay out production bases in eastern Guangdong, western Guangdong and northern Guangdong. |
| 28 | Yunnan Province | Honghe Prefecture People's Government | Notice on Issuing Honghe Prefecture's Measures to Promote Economic Stability and Quality Improvement in 2024 | Start the construction of the fourth phase of the expansion project of Kaiyuan Power Plant and the Maitreya low calorific value coal power generation project, ensure that the expansion project of Honghe Power Plant will be put into operation within the year, focus on promoting the construction of 37 photovoltaic projects such as Honghe "scenery storage" integrated base and 8 wind farm expansion projects, start the construction of the second phase of Honghe municipal solid waste incineration power plant and the Yuanyang municipal solid waste incineration power plant project, and accelerate the construction of Jianshui incineration power plant, strive for Luxi Pumped Storage Power Station to Approve and Start, Actively Plan and Promote Shared Energy Storage Projects |
| 29 | Shandong Province | Shandong Energy Bureau | Notice on Issuing the Key Points of Energy Transformation in 2024 | To improve the quality and efficiency of photovoltaic development, speed up the construction of the third batch of national large base list projects, complete Jining era Yongfu and other projects, actively promote the preliminary work of the Lubei base project, and promote the early construction of qualified projects. We will steadily promote the construction of basic fixed offshore photovoltaic projects, strive for the completion of Yantai Zhaoyuan Project, realize the "zero breakthrough" of offshore photovoltaic, continue to promote the large-scale development of distributed photovoltaic in the whole county, actively promote the mature development models of a number of pilot counties such as Dezhou Qihe, Linyi Yishui and Weifang Zhucheng, and improve the quality of distributed photovoltaic development. The installed capacity of photovoltaic power generation in the whole province has reached about 64 million kilowatts. |
| 30 | Yunnan Province | People's Government of Yunnan Province | Notice on Issuing Several Measures to Accelerate the Development of Domestic and Foreign Trade in Yunnan Province | Strengthen industrial support for the integrated development of domestic and foreign trade, focus on key areas such as silicon photovoltaics, new energy batteries, and biomedicine, and cultivate a group of industrial clusters with international competitiveness and integrated development of domestic and foreign trade. E-commerce parks, promote the development of the "cross-border e-commerce industry belt" model, and drive more traditional industry groups to go to sea. Attract industries in the eastern coastal areas and other regions to transfer to Yunnan, build a national-level demonstration base to undertake domestic and foreign industrial transfer. In the characteristic fields of electronic terminal products, machinery and equipment, textiles, medicine, etc., lay out cross-border industrial chain cooperation |
| 31 | Anhui Province | People's Government of Anhui Province | Notice on Issuing the Special Action Plan for Effective Investment in Anhui Province (2024) | Accelerate the construction of advanced photovoltaic and new energy storage industrial clusters. Carry out in-depth special action on energy investment. We will comprehensively promote the construction of supporting power supply projects, complete and put into operation the second phase of Lixin plate power plant, Hefei and Chuzhou natural gas peak shaving power plants and other projects, and start the construction of a 800 kV UHV DC transmission project in northern Shaanxi and Anhui Province, and the second line of Sichuan-East gas transmission (Anhui section) and other projects. Accelerate the green and low-carbon transformation of energy, promote the construction of integrated projects of source, network and storage, start the implementation of the park suitable building roof photovoltaic full coverage action, wind power rural revitalization project, expand the scale of new energy storage power stations, speed up the construction of pumped storage projects such as Tongcheng and Ningguo. |
| 32 | Zhejiang Province | People's Government of Kaihua County, Quzhou City | Notice on Printing and Distributing "Implementation Opinions on Investment Promotion in 2024 of Kaihua County" and "Assessment Measures for Investment Promotion in 2024 of Kaihua County" | In 2024, Kaihua County targeted the project to attract three main directions. These include focusing on the "22" industrial chain of organic silicon, sugar alcohol (sugar-free beverage), photovoltaic semiconductor and card card in Kaihua County, highlighting industrial transformation, strong chain supplementation and cluster development, focusing on attracting functional sugar alcohol, food, beverage, silicone coupling agent, silicone oil, silicone rubber, new silicon-based materials, photovoltaic auxiliary materials, film packaging materials and other industrial chain downstream product projects, targeting a number of industry benchmark enterprises, head enterprises and high. New technology enterprises and "specialized and special new" enterprises |
| 33 | Guizhou Province | Guizhou Provincial Department of Industry and Information Technology | Guiding Opinions on Promoting High Quality Development of Aluminum Industry | We will implement national and provincial laws and regulations on energy conservation and the policy of floating electricity prices in the electrolytic aluminum industry, make every effort to ensure the electricity demand of electrolytic aluminum enterprises, explore the implementation of cross-regional hydropower transactions, encourage the inclusion of clean energy such as wind power and photovoltaics into the electricity market transactions of electrolytic aluminum enterprises, and support the use of long-term coal index quotas for the tripartite joint trading system of coal, electricity and aluminum. |
| 34 | Zhejiang Province | Wenzhou Municipal People's Government | Notice on Issuing Several Policies for Further Promoting High-quality Economic Development in Wenzhou City | Building beautiful countryside. Moderately advance the construction of rural power grids, implement the national charging infrastructure award funds and provincial new energy vehicle promotion and application award and subsidy funds, formulate corresponding municipal award and subsidy policies, and strive to build more than 5200 public charging piles in rural areas, of which more than 600 are newly built annually. All localities are encouraged to implement the "Common Rich Photovoltaic Agriculture Promotion Project" by using recoverable land types above 25 degrees in combination with actual conditions" |
| 35 | Shanxi Province | Ruicheng County People's Government of Yuncheng City | Notice on Breakdown of Work Tasks in 2024 Government Work Report | While continuing to expand the volume of photovoltaic and wind power, we will strengthen the supporting facilities for energy storage and peak shaving, take into account the clean and efficient use of coal, and make every effort to build a multi-energy complementary comprehensive energy supply system of "scenery, water and fire storage" to speed up the progress of the three large base projects with investment in 2.83 billion yuan, so as to ensure full capacity grid connection by the end of June: 40MW photovoltaic projects in Molan (Phase III) with investment of 0.1 billion yuan, Ximo and Ximo and Fengyuan, Ximoto distributed roof in 0.06 billion yuan |
| 36 | Anhui Province | Suzhou Municipal People's Government of Suzhou Municipal Committee of the Communist Party of China | Notice on Issuing the Implementation Plan for Accelerating the Construction of Advanced Photovoltaic and New Energy Storage Industrial Clusters in Suzhou City | By 2027, it will exceed 40 billion yuan and strive to reach 50 billion yuan. Advanced photovoltaic and new energy storage industries will enter the stage of large-scale development from the initial stage of agglomeration. Significant progress will be made in the construction of industrial clusters with provincial characteristics. It will strive to make breakthroughs in the construction of national characteristic industrial clusters in advanced photovoltaic, build an advanced photovoltaic industry ecosystem with advanced technology, outstanding advantages and complete supporting facilities, and accelerate the promotion of the industry to the middle and high end of the value chain: new energy storage, accelerate the formation of lithium-ion battery energy storage as the leading, sodium ion battery energy storage, flow battery energy storage hydrogen energy storage and other multi-energy storage technology to promote the industrial layout. |
| 37 | Anhui Province | Hefei Municipal People's Government | Notice on Issuing Hefei New Energy Storage Development Plan (2023-2027) | Continue to expand the "new energy storage" application, the power side with the construction of energy storage in principle not less than 10000 kilowatts. Explore the layout of a number of independent energy storage power stations with an installed capacity of more than 30000 kilowatts in Feidong, Feixi, Changfeng, Lujiang, Chaohu and other areas rich in photovoltaic and wind resources through crowdfunding, cluster sharing and leasing. Continue to promote the application of "photovoltaic energy storage" and "new energy storage", and support the development of new energy storage to participate in the power in stock market and auxiliary service market transactions, shared energy storage, contract energy management and other business model exploration. |
| 38 | Gansu Province | Dingxi Municipal People's Government | Notice on Issuing the Work Plan for the Development of New Materials Industry in Dingxi City in 2024 | Dingxi High-tech Zone will be built into a fastener production base in the whole province, driving the transformation and upgrading of the industrial chain, coordinated development, strengthening cooperation with Dongfang Electric, fully building a new energy equipment manufacturing base in Longxi, pushing forward the development of new energy battery materials. By 2024, the new energy materials industry will achieve a direct production of 0.8 billion yuan, an increase of more than 8%, and strive to complete and put into operation the tellurium pot thin-film solar cell project by the end of China Building Materials Co., Ltd. |
| 39 | Zhejiang Province | Ningbo Development and Reform Commission | Ningbo City on the further expansion of demand, strong momentum, quality and efficiency to promote high-quality economic development of a number of policies (Ningbo City 2024 "8 4" economic policy) | Increase the construction of the United States and rural areas, encourage the use of the stock of agricultural facilities, such as greenhouses, the implementation of the "co-rich photovoltaic agricultural upgrading project". Advocate green and low-carbon consumption, promote the large-scale application of new energy and clean energy vehicles, and the proportion of new energy buses and taxis in the main urban area exceeds 70%. Encourage the development of new offshore trade in bulk commodities such as oil and gas, chemicals, and new energy materials. The policy advantages of the special customs supervision zone support the development of new business formats such as "bonded culture", "bonded storage" and "bonded maintenance" |
| 40 | Jiangsu Province | Yancheng Municipal People's Government | Notice on Issuing the Three-year Action Plan for the High-quality Development of Yancheng's Marine Economy (2024-2026) | To create an international maritime new energy comprehensive utilization highland. Promote the construction of offshore wind power development bases and photovoltaic comprehensive utilization bases in coastal tidal flats and near and far seas, take CNOOC LNG project as the leader, explore the construction of offshore "energy islands" integrating wind power, photovoltaic, cold energy, hydrogen energy and other resources, build a marine comprehensive energy base with global influence, make good use of rich scenery resources, and accelerate the centralized, contiguous and large-scale development of coastal tidal flats and offshore marine scenery, coordinate the construction of offshore photovoltaic and 2.65 million-kilowatt offshore wind power projects. |
| 41 | Shanghai | Songjiang District People's Government | Action Plan for Refined Improvement of Urban Management in Songjiang District of Shanghai (2024-2026) (Draft) | Promote the high-quality application of renewable energy in new buildings. New civil buildings are constructed and operated in accordance with the basic level of green buildings and above standards. Promote the energy-saving renovation of existing buildings, build a number of green renovation demonstration projects of existing buildings, vigorously promote the pilot demonstration of ultra-low energy consumption buildings, deepen the supervision services of building energy consumption, and actively incorporate them into municipal platform monitoring. |
| 42 | Hunan Province | Hunan Development and Reform Commission, National Development Bank, Hunan Branch | (Notice on Organizing the Declaration of 2024 "Three High and Four New" Financing Special Projects | The total amount of this round of "three highs and four new" financing project is 150 billion yuan, focusing on supporting the construction of projects in the fields of modern industrial system, major infrastructure, energy security, ecological green development, people's livelihood security, new urbanization and other fields in our province, and comprehensively helping Hunan to develop energy security with high quality. In particular, it is proposed to support wind power projects relying on the large-scale layout of integrated bases, large-scale centralized photovoltaic bases in areas with relatively rich light resources and the whole county photovoltaic pilot projects |
| 43 | Shanghai | Jing'an District People's Government | Notice on Announcing the List of Key Energy-using Units in Jing 'an District in 2024 and Strengthening Energy Conservation and Carbon Reduction | According to the energy consumption of the unit, arrange and implement energy-saving transformation projects and funds in a planned way, actively develop the construction of renewable energy such as photovoltaic, give priority to the use of contract energy management mode, effectively improve energy utilization efficiency, reasonably allocate and correctly use energy measuring instruments in accordance with the relevant provisions of the state and this city, and support special energy-saving work such as energy audit and power sub-metering installation to ensure accurate and reliable sub-metering data |
| 44 | Guangdong Province | Shenzhen Pingshan District People's Government | Opinions on Building Industrial Clusters with International Competitiveness and Cultivating Industrial Clusters with Development Potential | Encourage enterprises to carry out distributed photovoltaic, new energy storage and other scene applications, vigorously promote optical storage direct soft (PEDF) building technology and virtual power plant demonstration, create a global demonstration city for the application of "interactive integration of optical storage and over-charging vehicle network" to support enterprises to develop core manufacturing equipment such as photovoltaic cells and lithium batteries, build new energy special equipment agglomeration areas to forward-looking layout perovskite photovoltaic technology, and carry out research and development innovation of battery control systems such as BMS, EMS, strengthen the R & D and manufacturing of new-generation battery technologies such as solid-state batteries and sodium-ion batteries, enhance the R & D and manufacturing capabilities of battery modules, strengthen the supply of high-quality battery products, and build an advanced manufacturing base for the new energy industry. |
| 45 | Henan Province | Xinyang Municipal People's Government | Opinions on Building Industrial Clusters with International Competitiveness and Cultivating Industrial Clusters with Development Potential | Promote the implementation of the two integrated projects of "scenery, fire and storage" and "source, network and storage" and the compressed air energy storage project, change energy from factors of production to industry, change energy weak cities to energy strong cities to implement renewable energy substitution actions, promote the construction of new power systems, actively implement power substitution in industry, transportation, construction and life, and cultivate a number of power substitution industries to implement energy conservation and carbon reduction actions in key industries, promote green manufacturing, promote energy-saving "one-stop" comprehensive services, strengthen smart energy services, actively promote the pilot of comprehensive energy management in public institutions, select a number of government agencies to do pilot projects according to local conditions, and explore new models of comprehensive energy management |
| 46 | Shanxi Province | Yangquan Municipal People's Government | government work report | Accelerate the development and growth of emerging industries. Vigorously cultivate "chain main chain nuclear specialization and special new" enterprises, promote beads into chains, chains into groups and groups, integrate and optimize nine key industrial chains, with a revenue scale of 22 billion yuan. The new energy battery industry focuses on the missing links in the industrial chain, promotes the commercial application of sodium ion batteries in electric vehicles, energy storage power stations, etc., accelerates the intelligent transformation of Huachu photoelectric, and builds an intelligent production base for photovoltaic modules |
| 47 | Xinjiang Uygur Autonomous Region | Tacheng District Development and Reform Commission | Notice on Issuing the Guiding Opinions on Promoting the Scientific and Orderly Development of Distributed Photovoltaic and Decentralized Wind Power in Tacheng Area | Distributed new energy projects shall be based on land and space planning, and shall not occupy cultivated land and permanent basic farmland, and ecological protection red line. Distributed new energy projects shall not be built in the centralized new energy planning area determined by the region. Distributed new energy projects shall be characterized by balanced adjustment in the power distribution system. The generated power shall be mainly consumed locally, and residents shall be encouraged to improve the green power consumption capacity by installing electric heating and charging piles. |
| 48 | Liaoning Province | Huludao Municipal People's Government | Notice on Issuing the Task Decomposition Plan for Huludao City to Implement the 2024 Provincial Government Work Report | We will make every effort to promote the large-scale development and utilization of wind power and photovoltaic, develop and expand the hydrogen energy industry cluster, steadily promote the construction of Xudabao nuclear power base, orderly promote the construction of Xingcheng pumped storage power station, accelerate the construction of an integrated energy base for wind, fire and nuclear storage, and make every effort to build a strong province of clean energy. |
Relevant attachments
COPYRIGHT © 2023 Nanjing Green Building Optoelectronics Co., Ltd. SEO